After a structural analysis and plenty of discussion, Barton County is ready to proceed with repairs the 100-year old Barton County Courthouse. Commissioners Monday voted 5-0 to accept the bid from Mid-Continent Restoration out of Fort Scott that will address the exterior problems that the building is facing. Administrator Phil Hathcock says a study last year by WDM Architects found that water infiltration around the edge of the roof through deteriorating caulking was causing plaster to pop off walls on the fourth floor. In addition to that, decorative work on the outside of the building was falling off.

(Read more: Great Bend Post)