The second phase of Garden City’s new Airport terminal is complete. Kansas Senator Jerry Moran was in attendance as the ribbon was cut to open the terminal of the new facility. Garden City’s original terminal was constructed in 1959 and no longer met demand. Rachelle Powell, Director of Aviation at the Garden City Regional Airport, said planning to replace the terminal began back in 2017. “With this new terminal project, we’ve doubled our gate capacity from one gate to two, which is huge for southwest Kansas, and also gave amenities to our traveling public such as the passenger boarding bridge and the baggage carousel,” she said. The terminal has updated technology and a new welcome message in multiple languages to serve the diverse population in the region. “We utilize the 26 languages that were spoken in our school district when we were doing the design to welcome folks to our community cause that’s part of our culture in southwest Kansas is making everybody feel welcomed,” said Powell.
Source: KSN-TV