Sunflower Electric Power Corp. is partnering on a 150-megawatt solar energy project near Fort Dodge Station, the company’s electric generating facility one mile southeast of Dodge City, Kan. Expected commercial operation is during the first half of 2026. Sunflower is a cooperatively operated wholesale generation and transmission utility serving seven member distribution utilities located in western Kansas. The Boot Hill Solar Project will join Sunflower’s 20-megawatt Johnson Corner Solar Project (JCSP), which came online in April 2020, and Sunflower’s 20-megawatt Sunflower Electric Solar @ Russell Project, scheduled for commercial operation in January 2025, in providing solar power to Sunflower’s members and those they serve. Because it produces on-peak energy during the hottest days of the year when the Sunflower system experiences its peak demand for electricity, the Boot Hill Solar Project will complement the company’s other generation resources, which are powered by natural gas, coal, and wind. In addition to providing on-peak renewable energy, the project will also provide the system with incremental capacity. The Victory Electric Cooperative Assn., Inc., located in Dodge City, joins Sunflower’s six other member-owners in supporting the Boot Hill Solar Project, which will surpass the JCSP and the Sunflower Electric Solar @ Russell projects as the largest operating solar facility in the state. Strategically locating the Boot Hill Solar project near existing Sunflower assets will provide cost and schedule benefits to all of the member-owners.
Source: Sunflower Electric Power Corporation