The City of Great Bend Administration & Public Works Departments would like to put out additional public information on Basement Flooding and our current wastewater treatment plant update.

The City of Great Bend is posting the KDHE – Kansas Department of Health & Environment Wastewater Incident Report Form to the City Website. This form needs to be filled out and given to KDHE for tracking and incident reporting because of the excessive rainfall we’ve had in Great Bend. As for our Wastewater system update, our wastewater plant is still working as it was designed however due to the excessive amounts of extra water being pumped into our wastewater system we are concerned about the overload. City Public Works Director Simon Wiley said, “Our system is designed for 3.6 million gallons per day, we typically average 1.2 Million per day and since May 22 we are running on 8 million per day.” City staff want to remind people to drain flooded basements or extra water into the street drains, NOT into the sanitary sewer system via floor drains, bathtubs, toilets, sinks, etc., this can and will create sewer backups in residents’ homes.

(Read more: Great Bend Post)